Copenhagen Fields & TFW’s workshop
Moderators: 52D, Tom F, Rlangham, Atlantic 3279, Blink Bonny, Saint Johnstoun, richard
-
- GER D14 4-4-0 'Claud Hamilton'
- Posts: 312
- Joined: Mon Oct 24, 2016 11:37 am
Re: Copenhagen Fields & TFW’s workshop
Moving on to the engine bodywork, that clever Mr Easton uses a cradle to support the running plate. This makes it pretty simple to assemble. I did, however, use my own piece of larger 5thou NS sheet for the change in direction of the running plate behind the raised cylinder section - this will get trimmed to size later on. The supplied squiggly bit was just too small and fiddly.
Similarly, the front steps were made out of 5thou strip, being much easier to hold as well as being closer to scale thickness: they are quite large and thin on the real thing. The strip is held in place but notched where it needs to break before soldering into place.
The piano front between the frames was made from som 0.6mm thick NS filed to shape: it took quite a while to get it nice and snug.
Will soon separate the running plate from the jig and offer it up to the chassis. Kits certainly speed up construction.
Tim
Similarly, the front steps were made out of 5thou strip, being much easier to hold as well as being closer to scale thickness: they are quite large and thin on the real thing. The strip is held in place but notched where it needs to break before soldering into place.
The piano front between the frames was made from som 0.6mm thick NS filed to shape: it took quite a while to get it nice and snug.
Will soon separate the running plate from the jig and offer it up to the chassis. Kits certainly speed up construction.
Tim
-
- GER D14 4-4-0 'Claud Hamilton'
- Posts: 312
- Joined: Mon Oct 24, 2016 11:37 am
Re: Copenhagen Fields & TFW’s workshop
The running plate is now mounted on the chassis with three bolts to locate it. She now begins to look like an engine.
Thin double sided PCB, tucked up behind the valence, has been used to insulate the front running plate from the cylinder assembly. The smoke box will bolt through the PCB.
Tim
Thin double sided PCB, tucked up behind the valence, has been used to insulate the front running plate from the cylinder assembly. The smoke box will bolt through the PCB.
Tim
- Atlantic 3279
- LNER A4 4-6-2 'Streak'
- Posts: 6540
- Joined: Fri Jun 26, 2009 9:51 am
- Location: 2850, 245
Re: Copenhagen Fields & TFW’s workshop
Heartening progress.
Most subjects, models and techniques covered in this thread are now listed in various categories on page1
Dec. 2018: Almost all images that disappeared from my own thread following loss of free remote hosting are now restored.
Dec. 2018: Almost all images that disappeared from my own thread following loss of free remote hosting are now restored.
-
- GER D14 4-4-0 'Claud Hamilton'
- Posts: 312
- Joined: Mon Oct 24, 2016 11:37 am
Re: Copenhagen Fields & TFW’s workshop
I’ve been working on Valour’s cab over the last couple of days. The windows have etched frames to be fitted - quite fiddly in fact. The front spectacle frames were too fine for use (over-etched for the thickness) and so some strip was bent up and soldered in place. The cab roof has some long slots left proud by half etching in order to accommodate the up right of the characteristic T section external roof ribs. These etched ribs were thinned down with a file to fit the slot and then soldered in place using my trusty surgical clips to hold them in place.
It was easier to solder the back rib in place with it still attached to the etch.
The roof is very rigid with the extra ribs.
I couldn’t resist putting the splasher with integral nameplate in place. It may, in fact, be the next job.
Tim
It was easier to solder the back rib in place with it still attached to the etch.
The roof is very rigid with the extra ribs.
I couldn’t resist putting the splasher with integral nameplate in place. It may, in fact, be the next job.
Tim
-
- GER D14 4-4-0 'Claud Hamilton'
- Posts: 312
- Joined: Mon Oct 24, 2016 11:37 am
Re: Copenhagen Fields & TFW’s workshop
The splashers are now fitted and the cab footplate & inside splashers made. I have used a slab of brass to support the cab floor, putting weight where it’s needed. This will also be drilled and tapped to take a longer pivot screw for the tender.
The line drawn down the middle of the cab front corresponds with a line drawn down the underside of the cab roof, which helps to align the two (not my idea, but Graham Nicholas’ who wrote up the 4mm example instructions). The UJ cap will push forwards a little on final assembly and clear the back head which will be made as a brass lost-plastic casting and fixed to the removable footplate.
I’m not quite sure how to do the Belpaire firebox, as it is 45 years since I last made one. There are etchings included in the kit, which might wrap around a slightly reduced diameter boiler turning. There should be plenty of weight over the driving wheels, as the drive head sits nice and low between the splashers.
Tim
The line drawn down the middle of the cab front corresponds with a line drawn down the underside of the cab roof, which helps to align the two (not my idea, but Graham Nicholas’ who wrote up the 4mm example instructions). The UJ cap will push forwards a little on final assembly and clear the back head which will be made as a brass lost-plastic casting and fixed to the removable footplate.
I’m not quite sure how to do the Belpaire firebox, as it is 45 years since I last made one. There are etchings included in the kit, which might wrap around a slightly reduced diameter boiler turning. There should be plenty of weight over the driving wheels, as the drive head sits nice and low between the splashers.
Tim
- Atlantic 3279
- LNER A4 4-6-2 'Streak'
- Posts: 6540
- Joined: Fri Jun 26, 2009 9:51 am
- Location: 2850, 245
Re: Copenhagen Fields & TFW’s workshop
I still have to pinch myself now and then to be sure that I'm not dreaming and that this incredibly neat construction really is taking place in 2mm scale....
Most subjects, models and techniques covered in this thread are now listed in various categories on page1
Dec. 2018: Almost all images that disappeared from my own thread following loss of free remote hosting are now restored.
Dec. 2018: Almost all images that disappeared from my own thread following loss of free remote hosting are now restored.
- manna
- LNER A4 4-6-2 'Streak'
- Posts: 3793
- Joined: Sun May 24, 2009 12:56 am
- Location: All over Australia
Re: Copenhagen Fields & TFW’s workshop
G'day Gents
Lovely build, I've just kicked myself, for 'Not' thinking to build the cab inside splashers 'Outside' the cab rather than fiddling about with them inside the cab.
manna
Lovely build, I've just kicked myself, for 'Not' thinking to build the cab inside splashers 'Outside' the cab rather than fiddling about with them inside the cab.
manna
EDGWARE GN, Steam in the Suburbs.
-
- LNER V2 2-6-2 'Green Arrow'
- Posts: 1090
- Joined: Mon Sep 19, 2011 12:24 am
Re: Copenhagen Fields & TFW’s workshop
This should convince those who think soldering is hard, in 4mm, that actually it is easier than
the nay sayers keep moaning about.
Tim's finishing is so good, his fingers being so over-scale, actually make it look more untidy than it does in real life.
Perhaps we should ask Tim to do a beginners guide to soldering!!!!!!!
Paul
the nay sayers keep moaning about.
Tim's finishing is so good, his fingers being so over-scale, actually make it look more untidy than it does in real life.
Perhaps we should ask Tim to do a beginners guide to soldering!!!!!!!
Paul
-
- GER D14 4-4-0 'Claud Hamilton'
- Posts: 312
- Joined: Mon Oct 24, 2016 11:37 am
Re: Copenhagen Fields & TFW’s workshop
Thanks for the kind comments. In my soldering I use a lot of heat, generally phosphoric acid flux and 144 solder. I also spend a good deal of time cleaning up. Always remember that solder moves to where the heat is.
I have since realised that the cab splashers are incorrect and will be replaced.
Tim
I have since realised that the cab splashers are incorrect and will be replaced.
Tim
-
- GER D14 4-4-0 'Claud Hamilton'
- Posts: 312
- Joined: Mon Oct 24, 2016 11:37 am
-
- GER D14 4-4-0 'Claud Hamilton'
- Posts: 303
- Joined: Sun Jun 26, 2011 1:07 pm
Re: Copenhagen Fields & TFW’s workshop
I can't understand how you do this so neatly!
Loads of other pictures of this miniature work of art have stopped displaying, only the most recent remain.
Loads of other pictures of this miniature work of art have stopped displaying, only the most recent remain.
-
- GER D14 4-4-0 'Claud Hamilton'
- Posts: 312
- Joined: Mon Oct 24, 2016 11:37 am
Re: Copenhagen Fields & TFW’s workshop
Unfortunately, Tinypic has stopped working, so they would need to be replaced by my new server. Very tedious.
Tim
Tim
-
- LNER V2 2-6-2 'Green Arrow'
- Posts: 1090
- Joined: Mon Sep 19, 2011 12:24 am
Re: Copenhagen Fields & TFW’s workshop
Very Nice Tim
thought it was only me who had lost the pics, but thankfully not.
Is it the photo, or is there a gap behind the firebox at the front of the cab, or are you as usual going to
blow us all away, by putting the firebox retaining straps there?
The belpaire looks really good, how did you make the front curve please?
Paul
thought it was only me who had lost the pics, but thankfully not.
Is it the photo, or is there a gap behind the firebox at the front of the cab, or are you as usual going to
blow us all away, by putting the firebox retaining straps there?
The belpaire looks really good, how did you make the front curve please?
Paul
-
- GER D14 4-4-0 'Claud Hamilton'
- Posts: 312
- Joined: Mon Oct 24, 2016 11:37 am