Annesley the latest

This forum is for the discussion of railway modelling of the LNER and its constituent companies.

Moderators: 52D, Tom F, Rlangham, Atlantic 3279, Blink Bonny, Saint Johnstoun, richard

Post Reply
Tom Quayle
GCR D11 4-4-0 'Improved Director'
Posts: 441
Joined: Tue Dec 06, 2005 9:41 am
Location: Barrow in furness Cumbria/HMS Collingwood Fareham
Contact:

Annesley the latest

Post by Tom Quayle »

I have just recived an original plan for the depot (thanks columbo) and track laying will start in urnist. I have started a model of the main running shed and coaling plant. All boards are still without legs but at the right size exept fiddle yards. I have renumbered a J39 and B1 in preperation for starting. I just have one or 2 kits to order as well. The main ones being an O4 2-8-0 and a A2 4-6-2 (to be 60533). I will proberbly have a few Bachmann A1s and the 9fs are coming. Initial testing will be done with a Bachmann 9f the longest loco I will use. All them coal wagons needed to fill the yard lol. My pockets are getting empty the yard will have to wait I think.
The weather here is Baltic but so were the tank engines
Furness Railway and GCR fan.
125mph tilt vs 126.5mph duck
Advanced North West Productions.
Post Reply