Annesley the latest
Moderators: 52D, Tom F, Rlangham, Atlantic 3279, Blink Bonny, Saint Johnstoun, richard
-
- GCR D11 4-4-0 'Improved Director'
- Posts: 441
- Joined: Tue Dec 06, 2005 9:41 am
- Location: Barrow in furness Cumbria/HMS Collingwood Fareham
- Contact:
Annesley the latest
I have just recived an original plan for the depot (thanks columbo) and track laying will start in urnist. I have started a model of the main running shed and coaling plant. All boards are still without legs but at the right size exept fiddle yards. I have renumbered a J39 and B1 in preperation for starting. I just have one or 2 kits to order as well. The main ones being an O4 2-8-0 and a A2 4-6-2 (to be 60533). I will proberbly have a few Bachmann A1s and the 9fs are coming. Initial testing will be done with a Bachmann 9f the longest loco I will use. All them coal wagons needed to fill the yard lol. My pockets are getting empty the yard will have to wait I think.
The weather here is Baltic but so were the tank engines
Furness Railway and GCR fan.
125mph tilt vs 126.5mph duck
Advanced North West Productions.
Furness Railway and GCR fan.
125mph tilt vs 126.5mph duck
Advanced North West Productions.