As Drawings Officer of the Sentinel Drivers Club I can advise that we do have General Arrangement drawings for the Y1, Y3, and (without checking) probably for the Y10 as well. Drawings cost £5 each to SDC members and £15 each to non-members. They are normally sent via email against payment.john coffin wrote: ↑Wed May 11, 2022 1:20 pm
The interesting thing is that although there were a lot of different Sentinels on the LNER, no drawings
appear to have survived, except a couple of magazine ones which of course we now question the accuracy of.
Paul
LNER dock shunter, steam railcars, Sentinel, Met-Camm
Moderators: 52D, Tom F, Rlangham, Atlantic 3279, Blink Bonny, Saint Johnstoun, richard
Re: The GNR didn't design a dock shunter, so neither did the LNER
-
- GER D14 4-4-0 'Claud Hamilton'
- Posts: 350
- Joined: Fri Oct 19, 2012 12:09 am
Re: The GNR didn't design a dock shunter, so neither did the LNER
Many thanks! I wasn't aware of this organisation, but I've just enjoyed exploring your website. A great resource!
Re: The GNR didn't design a dock shunter, so neither did the LNER
Further to my original posting I can confirm that the SDC does have General Arrangement drawings for the LNER Sentinel locos. Starting with the drawing number.......
L927 (a London Office drawing) Y1 8400/BR 68130/Departmental 37, the first LNER Sentinel with the early type cab and bunker with 2' - 8-1/2" diameter boiler.
8382 Y1/1 with later cab and bunker arrangement, but still with 2' - 8-1/2" diameter boiler and single funnel/chimney as had L927 too.
11070 Generally for the remainder of the Y1 class, now fitted with the 3' - 1" diameter 25%LTS (Larger Than Standard) boiler and a double funnel/chimney.
12450 Generally covering the Y3, built with the 25%LTS boiler and double funnel/chimney.
12015 Y10 double cab-ended 200 hp locos 8147 & 8148, BR 68186 & 68187.
While writing, as far as the Railcars are concerned Sentinel only supplied the boilers, engines and other mechanical parts including the power bogies. All the bodywork, frames etc. were done by Metropolitan-Cammell.
L927 (a London Office drawing) Y1 8400/BR 68130/Departmental 37, the first LNER Sentinel with the early type cab and bunker with 2' - 8-1/2" diameter boiler.
8382 Y1/1 with later cab and bunker arrangement, but still with 2' - 8-1/2" diameter boiler and single funnel/chimney as had L927 too.
11070 Generally for the remainder of the Y1 class, now fitted with the 3' - 1" diameter 25%LTS (Larger Than Standard) boiler and a double funnel/chimney.
12450 Generally covering the Y3, built with the 25%LTS boiler and double funnel/chimney.
12015 Y10 double cab-ended 200 hp locos 8147 & 8148, BR 68186 & 68187.
While writing, as far as the Railcars are concerned Sentinel only supplied the boilers, engines and other mechanical parts including the power bogies. All the bodywork, frames etc. were done by Metropolitan-Cammell.
-
- LNER V2 2-6-2 'Green Arrow'
- Posts: 1007
- Joined: Mon Sep 19, 2011 12:24 am
Re: The GNR didn't design a dock shunter, so neither did the LNER
Thanks Eightpot,
It is interesting that all the previously published stuff refers to them as Sentinel railcars, and makes little mention
of Metro Cammell's involvement.
I guess it is therefore possible that some data may be available at the Metro Cam archive?
Paul
It is interesting that all the previously published stuff refers to them as Sentinel railcars, and makes little mention
of Metro Cammell's involvement.
I guess it is therefore possible that some data may be available at the Metro Cam archive?
Paul
-
- LNER A3 4-6-2
- Posts: 1410
- Joined: Fri Dec 23, 2011 3:34 pm
Re: LNER dock shunter, steam railcars, Sentinel, Met-Camm
I have altered the title to better represent the interesting steam railcar content