The Reid D30 'Superheated Scott' (NBR Class J) 4-4-0 Locomotives
The North British Railway (NBR) started to consider superheating in October 1910, and in February 1911 decided
to fit superheaters to the last two members of the final batch of D29 'Scotts'.
The superheaters were of the 18-element Schmidt type.
Reid also moved piston valves above the cylinders, resulting in a
higher boiler pitch. Rocking shafts were fitted to operate the piston valves in their new position.
Although the NBR continued to classify these engines as 'Class J', the LNER gave them the separate classification of
'D30'. The names continued to follow the Sir Walter Scott theme, and the locomotives are often known as
'Superheated Scotts' or just 'Scotts'.
The initial two prototypes (LNER D30/1) were followed by twenty five production locomotives (LNER D30/2) built
in three batches between 1914 and 1920. These engines replaced the 18 element Schmidt superheater with a
24 element Robinson superheater.
The number of boiler tubes was also reduced, and the diameter of the piston valves were increased from 8in to 10in.
The D30/2 in this form, represented the final development of
Drummond's 'Abbotsford' 4-4-0
design.
Both superheater types had pyrometers fitted to measure the degree of superheating. The LNER would
remove these after Grouping (1923).
Replacement Diagram 78 boilers were fitted from 1921, but there were only minor detail changes. These
boilers were interchangeable with the
D29, D33, and D34 classes.
Due to various boiler exchanges, D30/1 No. 9400 received a
Robinson boiler in 1927,
and No. 9363 received one in 1936.
Two D30/2s also ran with Schmidt superheaters for a while. These were No. 9499 (1933-4) and No. 9497 (1937-40).
Doncaster started to design a significant rebuilding of the NBR 4-4-0s in 1939. This was stopped during
World War 2, and was never restarted.
The two D30/1s were allocated to St. Margaret's shed for most of their lives, and they were initially used
on the non-stop expresses between Edinburgh and Carlisle. The D30/2s were introduced shortly after these services
were stopped, but
they were put to work on express passenger services over all of the NBR's main lines. Of particular note during
this period, were the Carlisle to Perth 'Jellicoe' naval leave trains which were usually hauled by two D30 Scotts.
During the early 1920s, the D30/2s were allocated to Haymarket (6), Dundee (6), Eastfield (5), St. Margaret's (3),
Perth (2), Thornton (2), and Carlisle (1).
The D30s continued to work main line services during the 1920s. Duties included the Glasgow - Edinburgh expresses, and
main line connecting services to the Flying Scotsman. The D30s continued to give good performance on these
services which tended to be tightly timed.
By the 1930s, new locomotives such as the D11 'Improved Directors' and
D49 'Shires' displaced many of the 'Scotts' to lesser duties and sheds.
The D30/2 allocation became: Haymarket (7), Thornton (5), Dundee (4), Eastfield (3), Perth (2), Hawick (2),
Aberdeen (1), and Carlisle (1). Most of their
work involved secondary passenger services, although they sometimes hauled express trains - especially as pilots.
The tendency of the D30s moving to lesser duties and sheds continued into the 1940s.
Although the first three D30s were withdrawn between 1945 and 1951; the last batch of boilers was built in 1946,
and the last D30 received a new boiler in 1951.
Despite the introduction of large numbers of Thompson B1s,
withdrawal of the remaining 'Superheated Scotts' did not restart until 1957.
The withdrawals were quick and the last superheated Scott was withdrawn in 1960.
Technical Details
|
|
D30/1 |
D30/2 |
| Cylinders (x2): |
(inside) |
20x26in. |
20x26in. |
| Motion: |
|
Stephenson |
Stephenson |
| Valves: |
|
8in piston |
10in piston |
| Boiler: |
Max. Diameter: |
5ft |
5ft |
|
Diagram No.: |
78 |
78 |
|
Pressure: |
165psi |
165psi |
| Heating Surface: |
Total: |
1573 sq.ft. |
1346 sq.ft. |
|
Firebox: |
139.7 sq.ft. |
139.7 sq.ft. |
|
Superheater: |
266.4 sq.ft. (18x1.06in) |
192.9 sq.ft. (22x1.1in) |
|
Tubes: |
871.3 sq.ft. (152x 1.88in) |
677.0 sq.ft. (124x 1.75in) |
|
Flues: |
295.6 sq.ft. (18x 5.5in) |
336.4 sq.ft. (22x 5in) |
| Grate Area: |
|
21.13 sq.ft. |
21.13 sq.ft. |
| Wheels: |
Leading: |
3ft 6in |
3ft 6in |
|
Coupled: |
6ft 6in |
6ft 6in |
|
Tender: |
4ft 0in |
4ft 0in |
| Tractive Effort: |
(@ 85% boiler pressure) |
18,700lb |
18,700lb |
| Wheelbase: |
Total: |
46ft 8.5in |
46ft 8.5in |
|
Engine: |
23ft 7in |
23ft 7in |
|
Tender: |
13ft 6in |
13ft 6in |
| Weight (full): |
Total: |
103 tons 6cwt |
104 tons 9cwt |
|
Engine: |
57 tons 6cwt |
57 tons 16cwt |
|
Tender: |
46 tons 0cwt |
46 tons 13cwt |
| Max. Axle Load: |
|
19 tons 14cwt |
19 tons 8cwt |
Preservation
The last D30 was withdrawn in 1960, and none have survived into preservation.
Models
Both Gem Loco Kits and PDK Models sell 4mm scale (OO gauge) kits of the D30. The GEM kit is a recently re-introduced
whitemetal kit with a new chassis etch.
Crownline have also produced a 4mm scale kit of the D30, but this is o longer available.
Locomotives
Reid re-introduced the policy of renaming NBR locomotives, and
both the D29s & D30s were given names associated with the literary works of
Sir Walter Scott. This theme resulting in both classes being known as the "Scotts".
No. 9419 The Talisman ran as Talisman from December 1931 to February 1938, and from May 1940
to March 1947.
|