The W.Worsdell J24 (NER Class P) 0-6-0 Locomotives
Wilson Worsdell succeeded his brother
(T.W.Worsdell) as the Locomotive Superintendent of the
North Eastern Railway (NER) in October 1890.
T.W.Worsdell remained at the NER as a consultant for a further
two years, during which time his successful J21 (NER Class C) mineral engine continued to be
built. These were built as compound locomotives with Joy valve gear. Neither of these features found favour with
W. Worsdell, who also considered the
J21's 5ft wheels to be too large for a mineral engine.
After T.W.Worsdell's final departure, he was able to amend
the order for the final two batches to use simple expansion. The Joy valve gear and wheels had already been ordered,
and these were kept. These last J21s were built in 1892 and early 1893.
By 1894, W.Worsdell had full authority to produce his own
mineral locomotive design. He could have modified the J21 design to use Stephenson valve gear,
simple expansion, and smaller driving wheels; but this would have resulted in a locomotive more powerful than the
NER's requirements. Therefore he designed a smaller 0-6-0 mineral locomotive using the 10ft 3in long, 4ft 3in diameter
boiler already in use on the
F8 2-4-2T (NER Class A),
D23 4-4-0 (NER Class G), and
J73 0-6-0T (NER Class L) locomotives. This design became
NER Class P, and later LNER Class J24. A total of seventy J24s were built between 1894 and 1898 in six batches.
Gateshead built five batches of ten each, and Darlington built the last batch of twenty.
The choice of the smaller boiler on the J24 proved to be a good one. This allowed the J24 to efficiently meet
the NER's immediate needs. As power requirements increased, the J24 design was modified in 1898 to take the
J21 boiler, producing the J25.
The only significant rebuilding experienced by the J24s was the fitting of piston valves and superheaters.
The opportunity was taken to fit superheaters at the same time as the piston valves.
Twenty boilers with Schmidt superheaters were built between 1914 and 1916. These were fitted to J24s between
1914 and 1920, as they required new cylinders or valves. By 1920, it was decided that superheaters could not
realise significant improvements in efficiency for the kind of short and intermittent work performed by the J24s.
The fitting of superheaters stopped, but piston valves would be fitted to two further J24s in 1923-4.
Over time, many of the J24s lost their superheaters as boilers were replaced or swapped. However in 1932-3, nine J24
boilers were built with Robinson superheaters.
Superheated J24s could be identified by their longer smokebox (3ft 7.25in vs. 2ft 7.75in).
Nos. 1860, 1893, and 1950 were fitted with tender cabs in about 1918-20, in order to replace
NER '1001' long boiler 0-6-0s on the exposed moorland
line to Rosedale. Although these were allocated away from Rosedale in 1927-29, they kept their tender cabs for many
years afterwards. In 1943, No. 1860 was recorded with its tender cab still intact.
Unlike many NER types, the J24s fitted within the LNER Composite Loading Gauge and did not have to be cut down.
The J24s were built with Ramsbottom safety valves contained within a brass trumpet.
As with virtually all other classes, the LNER eventually replaced these with Ross pop valves. Initially these
had a casing, but the casing was later removed.
Designed as short-haul mineral locomotives, the J24s proved to be a good complement to the
J21s which hauled the faster and more important freight. With their smaller wheels, the J24s
could start heavy loads more easily, and keep them moving.
They were initially allocated hauling the heavy coal trains between the Durham and Northumberland collieries and the
local ports. By Grouping (1923), sixty of the J24s were still allocated to this work. The exceptions could be found
at Selby (3), Blaydon (3), Northallerton (2), York (1), and Whitby (1).
During 1924, ten of the J24s were allocated to the Scottish area to replace the local
J36s hauling local mineral traffic on lightly-laid branch lines. The J24s had a lighter axle
loading which proved advantageous for this work. These ten were allocated to Haymarket (4), Parkhead (3), and
Dunfermline (3). The Scottish enginemen did not have a high opinion of the J24s, although they appreciated the
J24's powerful steam brake. The Scottish allocation of J24s remained in place, and five would still be working the
Scottish branches at Nationalisation (1948).
The NE Area J24s continued their mineral haulage throughout the 1920s. The first significant re-allocations
occurred in the late 1920s when the Cleveland Hills ironstone mines closed, causing the Rosedale J24s to be
moved to Saltburn.
By the early 1930s, the trade depression was hitting heavy industry badly and many of the J24s were found to be
surplus to requirements. The first withdrawals started in 1933, and fourteen were quickly withdrawn before the end of
1935. The rate of withdrawals slowed, and nine withdrawn in 1939 were brought back into service to meet wartime shortages.
Withdrawals restarted in 1942, leaving only 34 to survive into British Railways (BR) ownership (1948). BR quickly
withdraw the last J24s, with the last two being withdrawn in December 1951 from St. Margaret's and Newport.
Two J24s were sold to private owners. No. 1953 was withdrawn in May 1939 and sold to Harton Coal Co.
Harton renumbered it No. 7, and eventually scrapped it in 1946.
No. 5626 was sold to the National Coal Board (NCB) in November 1948 for use at Boldon Colliery. It was never renumbered
by the NCB, and was scrapped at Whitburn Colliery in July 1956.
Technical Details
|
|
Saturated |
Superheated |
| Cylinders (x2): |
(inside) |
18x24in. |
18.5x24in. |
| Motion: |
|
Stephenson |
Stephenson |
| Valves: |
|
slide |
7.5in piston |
| Boiler: |
Max. Diameter: |
4ft 3in |
4ft 3in |
| Boiler: |
Pressure: |
160psi |
160psi |
|
Diagram No.: |
69 |
69 |
| Heating Surface: |
Total: |
1093 sq.ft. |
1004 sq.ft. |
|
Firebox: |
98 sq.ft. |
98 sq.ft. |
|
Superheater: |
|
178 sq.ft. (18x1.1in) |
|
Tubes: |
995 sq.ft. (205x 1.75in) |
466 sq.ft. (96x 1.75in) |
|
Flues: |
|
262 sq.ft. (18x 5.25in) |
| Grate Area: |
|
15.6 sq.ft. |
15.6 sq.ft. |
| Wheels: |
Coupled: |
4ft 7.25in |
4ft 7.25in |
|
Tender: |
3ft 9.25in |
3ft 9.25in |
| Tractive Effort: |
(@ 85% boiler pressure) |
19,141 lb |
20,219 lb |
| Wheelbase: |
Total: |
37ft 0.75in |
37ft 0.75in |
|
Engine: |
15ft 9in |
15ft 9in |
|
Tender: |
12ft 8in |
12ft 8in |
| Weight (full): |
Total: |
73 tons 14cwt |
73 tons 14cwt |
|
Engine: |
38 tons 8cwt |
38 tons 8cwt |
|
Tender: |
35 tons 6cwt |
35 tons 6cwt |
| Max. Axle Load: |
|
14 tons 6cwt |
14 tons 6cwt |
Preservation
None of the J24s survived into preservation.
Models
Falcon Brassworks sell an etched 4mm scale
kit of the J24.
Acknowledgments